Connect with us

Economy

London's #Crossrail delayed to autumn 2021, three years behind schedule

SHARE:

Published

on

We use your sign-up to provide content in ways you've consented to and to improve our understanding of you. You can unsubscribe at any time.

London’s beleaguered multi billion-pound Crossrail project, already years behind schedule, will be further delayed until late 2021, the British capital’s transport operator said on Monday (6 January), writes Elizabeth Howcroft.

The train line, billed as Europe’s most ambitious infrastructure project, has been repeatedly delayed by problems with safety testing and signalling systems and Transport for London (TfL) said last year its cost could rise to $23 billion (£17bn).

TfL Commissioner Mike Brown told the London Assembly Budget and Performance Committee on Monday that the section of the new link between the rail hub of Paddington and Abbey Wood in southeast London was now expected to open between September and December 2021.

Brown said TfL had struck a confidential commercial deal with the Canary Wharf Group to remove the risk of TfL paying damages if the link between the Canary Wharf financial district and Heathrow airport was not completed by December that year.

“We’ve looked at a delay until the later stages of 2021, in terms of our business planning assumption,” Brown said, adding that the project was in “disarray”.

“The assumption we’ve made is I suppose at the pessimistic end but it’s the pragmatic end,” he said.

Brown said a critical issue was making sure the Siemens system (SIEGn.DE) on the tracks was compatible with the system built by Bombardier (BBDb.TO) in the trains.

Advertisement

In November, TfL said the project could cost an extra £650 million and not open until 2021, putting it more than two years behind schedule. It was originally due to be opened by Queen Elizabeth in December 2018.

Rebranded as the Elizabeth Line in 2016, it is expected to carry about 200 million passengers a year and alleviate pressure on London’s 19th century underground network, known as the Tube.

Share this article:

Share this:
Guest Contributor - Opinion

Opinions expressed are purely those of the author and not endorsed by EU Reporter. The article was unsolicited by EU Reporter, and the author guarantees the truthfulness of the contents of the article. No payment was made by EU Reporter to the author

EU Reporter publishes articles from a variety of outside sources which express a wide range of viewpoints. The positions taken in these articles are not necessarily those of EU Reporter. Please see EU Reporter’s full Terms and Conditions of publication for more information EU Reporter embraces artificial intelligence as a tool to enhance journalistic quality, efficiency, and accessibility, while maintaining strict human editorial oversight, ethical standards, and transparency in all AI-assisted content. Please see EU Reporter’s full A.I. Policy for more information.

Trending